• Aluminum Ground Mounting System,1SOLARWOLF SHOP,Aluminum Ground Mounting System-1SOLARWOLF SHOP
  • Aluminum Ground Mounting System,1SOLARWOLF SHOP,Aluminum Ground Mounting System-1SOLARWOLF SHOP

Aluminum Ground Mounting System

No.SW-AG3
AG3 Aluminum Ground Mounting System is designed for open-field solar PV installations and is suitable for residential and commercial projects. The system uses high-quality Aluminum 6005-T5 with an anodized surface finish for good corrosion resistance and long-term outdoor performance.
• Model: SW-AG3
• Installation site: Open field
• Material: Aluminum 6005-T5
• Surface treatment: Anodized
• Tilt angle: 5–40°
• Max. wind speed: 60m/s
• Snow load: 1.4kN/m²
• Ground clearance: According to project requirements
• Foundation: Ground screw or concrete block
• Warranty: 10 years
• Service life: 25 years
• Lead time: Within 15 days
Download
View all downloads
  • Aluminum Ground Mounting System,1SOLARWOLF SHOP,Aluminum Ground Mounting System-1SOLARWOLF SHOP

Description

The SW-AG3 Aluminum Ground Mounting System is a lightweight and durable PV mounting solution designed for open-field solar installations. It is suitable for residential, commercial and other distributed ground-mounted PV projects. The main structure is manufactured from Aluminum 6005-T5 and finished with anodization, providing a combination of structural strength, corrosion resistance and long-term outdoor durability.

The system supports adjustable tilt angles from 5° to 40°, allowing the mounting configuration to be adapted to different solar irradiation conditions, module layouts and project design requirements. The manufacturer's specified design parameters include a maximum wind speed of 60m/s and a snow load of 1.4kN/m². Actual project design should be verified according to local wind conditions, snow loads, soil conditions and PV module specifications.

Installation efficiency is one of the key advantages of the AG3. Its highly pre-assembled structure helps reduce the number of individual components that need to be assembled on site. The installation process includes fixing the foundation base, installing the front and rear legs, connecting the pre-assembled beam, installing the ground rails and securing the PV modules. This structure can help reduce installation time and on-site labor requirements.

The foundation can be configured with ground screws or concrete blocks according to site conditions. Ground clearance can also be customized according to project requirements. With a stated 10-year warranty and 25-year service life, the system is designed for long-term PV applications where corrosion resistance, installation efficiency and lifecycle cost are important considerations.

For project quotations, the required information includes PV module dimensions and quantity, panel layout, desired tilt angle, local wind and snow loads, and required minimum ground clearance